KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  3-6-2012
Number of Hours:  1.00
Manual Reference:  Page 7-7
Brief Description:  Right wing fuel tank #20

I was waiting for the proper sized NAS1352-08H10P socket head screws for the final assembly of my right tank. The 12P's were too long, so I went to ACS and picked up the 10P's.

After scuff and cleaning both surfaces, I mixed up a 31 gram batch of proseal and installed the fuel tank access cover.

The socket head screws were installed and I'll wait until after I test the tanks for leaks before lock wiring the screws together.

I'll wait a few weeks before leak testing the tank.
' style=

Scuffed and cleaned.

Scuffed and cleaned.

' style=

Cover sealed and screwed in place.

Cover sealed and screwed in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.